777 Garfield Avenue  |  Milford, Ohio 45150  |  (513) 831-1314 
School List District Calendar Board of Education Staff Directory Administrative Departments District Facts Downloads & Links
edline.net
ARCHITECTURAL DESIGNS
The files below include the architectural renderings and designs for the expansion and renovation of Milford High School.  Much of the addition includes a new 2-story wing to house the Ninth Grade Community.  The construction plan includes a new, more secure main entrance to better control who is able to enter the building during school hours.  There will be new expanded space for a larger cafeteria space necessary for 1800 students.  The construction work also includes improvements to the entire high school campus.  A new ring road will improve traffic circulation and provide more access to all sides of Milford HS for police and fire crews.  With the new ring road, changes are necessary for the athletic fields to make the best use of the existing space on the campus.

Design Plans
Site Plans Upon Completion of Project
These are the architectural renderings of the high school campus upon completion of the project.
Exterior Plans June 2008
Design plans for the exterior of Milford HS--the use of bricks helps to make a smooth transition from the existing building to the new additions
Floor Plan June 2008
Design shows interior changes with new front entrance and lobby, new NGC wing, new music section, expanded cafeteria, more science labs in the former cafeteria space and wider hallways in high traffic areas
Site Plan June 2008
Site plan includes changes to the entire campus with a new ring road, expanded cafeteria, new NGC wing and changees to athletic fields
QuickLinks
Bond Issue vs. Operating Levy
Bond Issue Progress
Architectural Designs
Bond Issue Facts
Bond Issue Timeline
Construction Bids
Archive of Pictures
Summer Schedule
Junior High Project